Case Studies

NASA

Precision cleaning project for Advanced Manufacturing Demonstration Engine (AMDE) Team.

oil contamination

TMC / Redstone Arsenal Case Study

Project:  Liquid Oxygen Pipeline  – Test Stand on Redstone Arsenal

Clogged Transfer Line Filter Housing

TMC / Redstone Arsenal Case Study

Transfer line – Rocket Motor Test Stand on Redstone Arsenal

Testimonials

TMC performs work to the highest quality

"TMC is a joy to work with. They perform their work to the highest quality and are very responsive to our needs as their customer. Their team is always a pleasure to work with!”

—D. - US Hose